S05443 Summary:

BILL NOS05443
 
SAME ASSAME AS A08952
 
SPONSORWRIGHT
 
COSPNSRONORATO
 
MLTSPNSR
 
Amd S165, Pub Serv L
 
Requires proceeding on an application for the modification of an existing major electric generating facility, or siting a new major electric generating facility near an existing facility to be completed in all respects within 6 months, when such modification or siting shall result in at least a 75% reduction in the rate of emissions, on a pounds per megawatt-hour basis, of oxides of nitrogen, oxides of sulfur and particulate matter; authorizes and extension of such deadline by 3 months under certain circumstances.