- Summary
- Actions
- Floor Votes
- Memo
- Text
S05443 Summary:
BILL NO | S05443 |
  | |
SAME AS | SAME AS A08952 |
  | |
SPONSOR | WRIGHT |
  | |
COSPNSR | ONORATO |
  | |
MLTSPNSR | |
  | |
Amd S165, Pub Serv L | |
  | |
Requires proceeding on an application for the modification of an existing major electric generating facility, or siting a new major electric generating facility near an existing facility to be completed in all respects within 6 months, when such modification or siting shall result in at least a 75% reduction in the rate of emissions, on a pounds per megawatt-hour basis, of oxides of nitrogen, oxides of sulfur and particulate matter; authorizes and extension of such deadline by 3 months under certain circumstances. |